✓API 5L edition clearly stipulated (e.g., 47th Edition)
✓Material grade confirmed (e.g., X52, X65, X70)
✓Product Specification Level confirmed as PSL2
✓Manufacturing process specified (SMLS, HFW, LSAW)
✓OD and minimum wall thickness calculated by design code
✓Design pressure and hoop stress checked against SMYS
✓Gas composition analyzed for wet H₂S and CO₂ content
✓Sour-service Annex H invoked if H₂S is present
✓Maximum carbon equivalent (CEIIW / CEPcm) defined
✓Phosphorus (≤0.015%) and Sulfur (≤0.003%) restricted
✓CVN impact test temperature defined (e.g., 0°C, -20°C)
✓DWTT testing required for gas lines with OD ≥ 20"
✓Mill hydrotest pressure held at 90–100% SMYS
✓Automated ultrasonic NDT coverage confirmed for welds
✓Bevel ends checked with magnetic particle testing
✓Pipe end ovality tolerance held within field limits
✓Individual pipe-to-heat number traceability verified
✓EN 10204 3.1 or 3.2 inspection certificate mandated
✓Inspection and Test Plan (ITP) approved prior to rolling
✓TPI hold, witness, and review points formally agreed