| Rated throughput | Above 60 cells/minute | One cell per second is the minimum planning point for a high-volume 2026 line. | Verify sustained output during a continuous production run, not only the machine’s short-cycle demonstration. |
| Good-cell output | At least 3,000 good cells/hour at 85% OEE | A nominal rate of 60 cells/minute equals 3,600 cells/hour before availability, performance, and quality losses. | Calculate good output using measured cycle time, planned stops, minor stops, and first-pass yield. |
| Cell-format range | Support common cylindrical formats from approximately 18 mm to 46 mm diameter, with configurable cell lengths | A wider format range improves product flexibility and reduces equipment replacement risk. | Check tooling, guides, grippers, recipes, and change parts for every intended cell size. |
| Indexing and cycle time | Effective takt time of 1.0 second per cell or faster | A fast, stable indexing system is essential when several assembly operations must be completed within one second. | Measure the slowest station, transfer motion, buffer capacity, and recovery behavior after a stoppage. |
| Welding capability | Controlled laser or resistance welding with closed-loop process monitoring | Weld consistency directly affects electrical resistance, mechanical integrity, and downstream reliability. | Request weld-energy records, current or power monitoring, electrode condition tracking, and traceable alarm data. |
| Inspection coverage | 100% automated inspection for polarity, presence, orientation, dimensions, and critical weld features | High-speed assembly requires in-line detection because manual sampling cannot reliably identify every defect. | Validate detection capability using known-good and known-defect samples before final acceptance. |
| First-pass yield | At least 98% for the assembly process | A high nominal rate loses economic value if excessive rework, scrap, or false rejects reduce good-cell output. | Separate process defects from incoming-material defects and report both actual yield and false-reject rate. |
| Changeover time | 30 minutes or less for a qualified format change | Short changeovers allow multiple cell formats or product variants without sacrificing excessive production time. | Time the complete changeover, including tooling replacement, recipe loading, calibration, and first-piece approval. |
| Overall equipment effectiveness | 85% or higher after ramp-up | OEE combines availability, performance, and quality, providing a more realistic capacity indicator than rated speed alone. | Use a defined OEE calculation and collect downtime reasons automatically through the machine control system. |
| Traceability | Cell-level or batch-level records linked to process parameters | Traceability supports root-cause analysis, quality containment, and compliance reporting. | Confirm timestamped records for cell identity, recipe, inspection result, weld data, alarms, and operator actions. |
| Safety and environmental controls | Interlocked guarding, emergency stops, fume extraction, and controlled handling of electrolyte or solvent areas | Fast automated equipment must protect personnel while controlling electrical, mechanical, laser, chemical, and fire-related hazards. | Review risk assessments, guarding validation, exhaust performance, fire protection, and applicable local regulations. |
| Expansion capacity | Modular stations and at least 15% practical capacity headroom | Headroom accommodates future demand, process optimization, and minor performance losses without immediate capital replacement. | Confirm available space, spare I/O, robot or feeder capacity, software licensing, and upgrade procedures. |