| Bluetooth Technology Experience | 20% | Experience with Bluetooth Low Energy and Bluetooth Classic products, radio performance, pairing behavior, profiles, antenna integration, and coexistence with Wi-Fi or cellular signals. | At least 3 years of relevant project experience and multiple successfully delivered wireless products. | Anonymized project summaries, engineering resumes, wireless design reviews, and examples of completed validation reports. | 1–5 |
| RF Design and Antenna Capability | 15% | Ability to review antenna placement, impedance matching, ground clearance, enclosure effects, transmission power, receiver sensitivity, and radio-frequency layout. | Documented RF review process with calibrated measurement equipment and controlled antenna-tuning procedures. | RF test plans, antenna matching records, network-analyzer calibration certificates, and sample pre-compliance reports. | 1–5 |
| Bluetooth Qualification and Regulatory Support | 12% | Capability to prepare technical files, manage qualification requirements, coordinate regulatory testing, and identify regional radio approvals required for the target market. | Clear responsibility matrix covering product qualification, radio testing, labeling, technical documentation, and change control. | Qualification workflow, regulatory checklist, sample technical file index, and previous test schedules with sensitive information removed. | 1–5 |
| PCB Assembly and Component Control | 12% | Surface-mount assembly accuracy, fine-pitch placement, moisture-sensitive device handling, component traceability, counterfeit prevention, and approved vendor management. | Automated optical inspection, controlled moisture storage, lot-level traceability, and documented incoming inspection procedures. | Process flow chart, component traceability sample, storage records, inspection criteria, and nonconforming-material procedures. | 1–5 |
| Testing and Firmware Integration | 10% | Functional testing of advertising, scanning, pairing, connection stability, power consumption, firmware updates, reset behavior, and communication with mobile or host applications. | A repeatable test fixture or automated test procedure covering both hardware functions and Bluetooth communication behavior. | Test specifications, fixture photographs, automated test logs, firmware release records, and sample failure-analysis reports. | 1–5 |
| Manufacturing Quality System | 10% | Process control, corrective and preventive action, first-article inspection, statistical monitoring, change management, and internal audit practices. | Formal quality management system with documented CAPA, engineering-change approval, and production audit procedures. | Quality manual index, process-audit checklist, CAPA example, first-article report, and engineering-change form. | 1–5 |
| Prototype and New Product Introduction | 8% | Speed and control of prototype builds, design-for-manufacturing feedback, pilot production, engineering validation, and transition to mass production. | Defined stage-gate process with documented design reviews before pilot and volume production. | New product introduction timeline, design-review checklist, pilot-build report, and sample manufacturing-readiness assessment. | 1–5 |
| Production Capacity and Scalability | 5% | Available assembly lines, equipment utilization, labor capacity, production scheduling, test throughput, and ability to support demand increases. | Capacity plan showing current load, reserved capacity, bottleneck controls, and realistic lead times for pilot and volume stages. | Capacity model, anonymized production schedule, line-balance report, and equipment maintenance plan. | 1–5 |
| Reliability and Environmental Validation | 4% | Thermal cycling, vibration, humidity, drop testing, connector durability, battery-related safety checks, and long-duration wireless connection testing. | Validation plan matched to the product environment, with defined acceptance criteria and documented failure analysis. | Reliability matrix, environmental test reports, accelerated-life assumptions, and corrective-action records. | 1–5 |
| Communication, Security, and Documentation | 4% | Technical communication, issue escalation, protection of design files, revision control, firmware confidentiality, and clarity of project reporting. | Single accountable project contact, controlled document access, regular status reporting, and response targets for technical issues. | Communication plan, document-control procedure, issue tracker example, confidentiality process, and sample weekly project report. | 1–5 |